Written and reviewed by KAN, Owner of Anhui Gangya Construction Machinery Sales Co., Ltd.
Experience basis: Based on real quotation discussions with overseas used excavator buyers, including machine preparation, attachments, FOB and CIF inquiries, China-side transport, dismantling, loading, ocean freight coordination and destination-cost communication.
Last reviewed: July 2026
Quick Answer: What Is Included in Used Excavator Total Landed Cost?
The total cost of importing a used excavator is not only the machine price plus ocean freight.
Buyers may also need to calculate:
- Machine preparation
- Repainting
- Parts replacement
- Attachments
- China inland transport
- Dismantling and loading
- Ocean freight
- Marine insurance
- Destination port charges
- Import duty and tax
- Customs clearance
- Local transport
- Unloading and reassembly
- Initial service after arrival
Used excavator total cost should be calculated in separate layers: the machine and preparation cost, China-side transport and loading, international freight and insurance, destination-side import costs, local delivery and reassembly, and an arrival-service reserve. A supplier can usually quote the machine and China-side work and estimate current freight, while port charges, duty, tax, customs clearance and local transport normally require confirmation in the buyer’s country.
Total Cost Formula
Estimated Jobsite-Ready Budget = Machine and Preparation + China-Side Logistics + International Shipping + Destination-Side Costs + Local Delivery and Reassembly + Arrival Reserve
The cheapest machine is not always the lowest-cost purchase.
Total Landed Cost Summary Guide
1. Machine and Preparation
Usually quoted by the supplier
This may include:
- Machine price
- Repainting
- Parts replacement
- Undercarriage work
- Attachments
- Oil and filter service requested before shipment
2. China-Side Logistics
Usually quoted or confirmed before shipment
This may include:
- Transport from the machine location to the Chinese export port
- Dismantling
- Loading
- Export-side handling included in the agreed quotation
3. International Shipping
Usually estimated before booking
This may include:
- Ocean freight
- Marine insurance
Freight can change according to the route, destination port, machine size, shipping method and current market conditions.
4. Destination and Local Costs
Normally confirmed by the buyer locally
This may include:
- Destination port charges
- Customs clearance
- Import duty
- Local taxes
- Port-to-jobsite transport
- Unloading
- Reassembly
- Local permits when required
Reading Navigation
- Port-Arrival Cost vs Jobsite-Ready Budget
- Why the Same Excavator Can Have Different Final Costs
- Machine, Preparation and Attachment Costs
- China Transport, Dismantling and Shipping
- FOB, CIF and Destination-Side Costs
- Which Costs Can Be Estimated—and Which Must Be Confirmed Locally?
- Real Example: Helping a First-Time Egypt Buyer
- Final Used Excavator Landed Cost Worksheet
- Frequently Asked Questions

1. Port-Arrival Cost vs Jobsite-Ready Budget
Many buyers ask:
“How much is this excavator delivered to my port?”
This is an important question.
However, the cost to the destination port is not always the same as the total amount required before the machine can start working.
In this guide, we separate two different budget levels.
Estimated Port-Arrival Cost
This may include:
- Used excavator price
- Required machine preparation
- Attachments
- China inland transport
- Dismantling
- Loading
- Ocean freight
- Marine insurance when included in the agreed shipping term
This estimate helps the buyer understand the cost before or when the machine reaches the named destination port.
Estimated Jobsite-Ready Budget
The wider jobsite-ready budget may also include:
- Destination port charges
- Customs clearance
- Import duty and local taxes
- Customs broker fees
- Port-to-jobsite transport
- Unloading
- Reassembly
- Initial inspection
- Oil and filter replacement
- Spare parts or maintenance reserve
These local costs can be different in every country.
A China-based supplier can usually help estimate the machine, preparation, China-side logistics and current shipping costs.
The final destination-side costs normally need confirmation from the buyer’s local customs broker, port agent, transport company or technical team.
2. Why the Same Excavator Can Have Different Final Costs
A used excavator does not have one universal final cost.
Even when two buyers ask about the same model, their total budgets may be different.
One buyer may request:
- Original paint
- Current undercarriage condition
- Standard bucket
- Delivery to a major seaport
Another buyer may request:
- Full repainting
- New track chains or track shoes
- Hydraulic breaker
- Quick coupler
- Additional bucket
- Delivery through a neighboring country to an inland destination
The machine model may be the same, but the purchase scope is different.
The total budget may also change because of:
- Destination country
- Destination port
- Number of machines
- Actual machine dimensions
- Required attachments
- Repainting requirements
- Undercarriage replacement
- Dismantling plan
- Shipping method
- Local customs requirements
- Distance from the port to the final jobsite
“Some buyers compare only the machine prices. I compare the total amount they may finally spend before the excavator starts working.” — KAN
This does not mean that the lowest-priced excavator is always a poor choice.
It means that buyers should compare the complete purchasing scope, not only one machine-price number.
3. Machine, Preparation and Attachment Costs
The first cost layer is the actual excavator.
Before requesting a total cost estimate, buyers should confirm which machine is being offered and what condition is expected at delivery.
Machine Price
The quotation should refer to the actual excavator being offered.
Important information may include:
- Model
- Current condition
- Production year when available
- Displayed working hours
- Configuration
- Current photos
- Working video
Two excavators of the same model may have different prices because their condition is different.
Possible differences include:
- Exterior condition
- Engine condition
- Hydraulic condition
- Undercarriage wear
- Attachments
- Previous repairs
- Preparation requirements
For used equipment, the model name alone is not enough to explain the price.
Repainting and Exterior Preparation
Some buyers prefer original paint because they want to see more of the machine’s previous condition.
Other buyers prefer a repainted machine because appearance is important for resale or final delivery.
Neither preference is automatically right or wrong.
Before confirming the quotation, ask:
- Is the machine currently original paint?
- Is partial paint repair required?
- Is full repainting required?
- Is repainting included in the quoted price?
If repainting is added after the first quotation, the cost and delivery schedule may change.
Undercarriage and Parts Replacement
Depending on the current machine and buyer requirements, replacement work may include:
- Track chains
- Track shoes
- Rollers
- Sprockets
- Seals
- Other visible wear parts
The quotation should explain:
- Which parts will be replaced
- Whether the parts are new or used
- Whether installation is included
A lower machine price may not remain lower after major parts replacement is added.
Attachments
Common attachments include:
- Hydraulic breaker
- Quick coupler
- Large bucket
- Narrow bucket
- Additional bucket
- Grapple
- Breaker piping
Before comparing prices, confirm:
- Is the attachment included?
- Is it new or used?
- Is installation included?
- Are hydraulic pipes and connections included?
- Will the attachment be shipped with the excavator?
- Does the attachment change the loading plan?
Attachments may affect:
- Purchase price
- Total weight
- Loading space
- Packaging
- Shipping arrangement
4. China Transport, Dismantling and Shipping
Before a used excavator leaves China, several costs may occur between the machine location and the export port.
These may include:
- Transport from the yard or jobsite to the port
- Dismantling
- Loading
- Export-side handling
- Preparation for the selected shipping method
In our own FOB quotation process, China-side transport, agreed dismantling and loading are normally calculated according to the confirmed machine and shipping plan.
The exact included scope should still be written clearly in the quotation.
Small Excavators: Around 5–7 Tons
Small excavators are often suitable for container loading.
Based on our actual loading experience:
- Around 5-ton excavators may sometimes be loaded at approximately four units in one container.
- Around 6–7-ton excavators may be loaded at approximately three to four units, depending on their actual dimensions.
- Many 7-ton excavator loading plans are closer to three units per container.
The final quantity depends on:
- Machine width
- Machine height
- Boom and arm position
- Bucket size
- Blade configuration
- Additional attachments
These numbers are practical references, not fixed guarantees.
The final loading plan should be confirmed using the actual machine dimensions.

Excavators Around 20 Tons
For machines such as:
- CAT 320
- Komatsu PC200
- Hitachi ZX200
a common approach is to remove:
- Boom
- Arm
- Bucket
This can reduce shipping volume and improve the loading plan.
However, not every buyer chooses the same method.
Some machines may be shipped with less dismantling or without dismantling, depending on:
- Shipping route
- Available vessel or loading method
- Buyer preference
- Cost comparison
- Destination handling ability
Excavators Above 30 Tons
Larger excavators usually require more detailed transport planning.
Depending on the machine and shipping method, dismantling may include:
- Boom
- Arm
- Bucket
- Counterweight in some cases
Reducing the machine dimensions may lower transport volume.
However, the buyer should also calculate what happens after arrival.
Possible local costs include:
- Crane rental
- Labor
- Technician support
- Tools
- Reassembly space
A lower freight amount may not create a lower final cost if reassembly is difficult or expensive at the destination.
5. FOB, CIF and Destination-Side Costs
Many experienced importers already understand FOB and CIF.
First-time buyers may need more help separating the responsibilities.
The most useful question is not only:
“Is this quotation FOB or CIF?”
The better question is:
“Where does this quotation responsibility end, and which costs are still outside it?”
FOB: Check the Written Scope
In our own quotation process, an FOB offer may include the agreed:
- Machine price
- Preparation work
- China inland transport
- Dismantling
- Loading
- Export-side work before the agreed FOB point
However, the trade term does not automatically define every machine-preparation service.
Repainting, parts replacement, attachments, dismantling and other agreed work should still be listed separately in the quotation or contract.
Ocean freight, insurance, destination charges and local costs are not automatically included in an FOB machine quotation.
CIF: Port Arrival Is Not Jobsite Delivery
A CIF quotation may include the agreed:
- Machine and preparation cost
- Ocean freight
- Marine insurance
- Delivery to the named destination port under the agreed terms
However:
A CIF price is not automatically the final cost at the buyer’s jobsite.
The buyer may still need to confirm:
- Destination port charges
- Customs clearance
- Import duty
- Local taxes
- Port storage when applicable
- Local transportation
- Unloading
- Reassembly
The agreed trade term, named port and written quotation should be checked together.
When necessary, buyers should also confirm the interpretation with their freight forwarder, customs broker or trade adviser.
Destination-Side Costs
Possible destination-side costs may include:
- Port handling
- Terminal-related charges
- Documentation
- Local agency fees
- Customs inspection-related costs
- Storage or delay-related charges when applicable
The exact items vary by country and port.
A supplier in China should not promise one fixed destination charge, duty rate or local transport cost for every market.
Inland Countries
Buyers in countries without direct seaports may need to import through a neighboring country and then arrange additional land transport.
Examples may include:
- Uganda
- Rwanda
- Zimbabwe
The buyer should confirm:
- Entry port
- Border route
- Customs process
- Inland transport
- Final unloading
with local customs agents and transport companies before confirming the final budget.
6. Which Costs Can Be Estimated—and Which Must Be Confirmed Locally?
A reliable cost estimate should not make every number look equally certain.
The costs should be separated into four groups.
A. Supplier-Confirmed Costs
These can normally be quoted after the machine and delivery scope are confirmed.
They may include:
- Machine price
- Repainting
- Parts replacement
- Undercarriage work
- Attachments
- China inland transport
- Agreed dismantling
- Loading
B. Costs Estimated Before Shipping
These may change before final booking.
They may include:
- Ocean freight
- Marine insurance
The estimate depends on the current route, destination port, shipping method and available schedule.
C. Costs the Buyer Should Confirm Locally
These normally depend on the destination country.
They may include:
- Destination port charges
- Import duty
- Local taxes
- Customs-clearance fees
- Local inland transport
- Unloading
- Reassembly
- Local permits or border transport
D. Arrival Reserve
This is not a fixed percentage.
The amount should depend on the machine condition and local maintenance costs.
Possible items include:
- Initial inspection
- Engine oil
- Hydraulic oil inspection
- Filters
- Grease
- Wear parts
- Basic spare parts
- Necessary maintenance
A responsible quotation should clearly separate confirmed costs, estimated costs, locally confirmed costs and reserve items.
Cost Questions to Confirm Before Comparing Offers
Before comparing final costs, confirm:
- Is the quotation FOB, CIF or another agreed term?
- Are repainting and preparation included?
- Are attachments included?
- Are China transport, dismantling and loading included?
- Is ocean freight estimated or already booked?
- Which destination-side costs require local confirmation?
“Before comparing prices, first make sure every supplier is quoting the same scope of work.” — KAN
For a full machine-condition and quotation comparison process, read:
How to Compare Used Excavator Quotations From Different Suppliers
For a broader remote-purchasing process, read:
How to Buy a Used Excavator from China Safely
7. Real Example: Helping a First-Time Egypt Buyer
We previously communicated with a buyer from Egypt who was not familiar with FOB and CIF.
At the beginning, he was not fully clear about:
- Which costs were included in the machine quotation
- Which costs occurred before shipment
- What the CIF estimate covered
- Which costs could still occur after arrival
Instead of only sending another price, we helped him separate the process into different cost layers.
We also assisted with communication involving his local customs-clearance contact.
Step by step, the buyer understood:
- Which costs we could quote
- Which shipping costs we could help estimate
- Which destination-side costs needed confirmation in Egypt
- Why the final budget could not be calculated from the machine price alone
For a first-time importer, understanding cost responsibility can be as important as choosing the excavator.
A cheap quotation is not useful when the buyer does not understand which major costs are missing.

8. Final Used Excavator Landed Cost Worksheet
Use this worksheet before confirming your budget.
Buyer and Machine Information
Country:
____________________
Destination port:
____________________
Final destination or jobsite:
____________________
Machine model:
____________________
Quantity:
____________________
Required attachments:
____________________
Repainting required:
Yes / No / To be confirmed
Undercarriage or parts work required:
____________________
A. Supplier-Confirmed Cost Subtotal
Machine price:
____________________
Preparation and repainting:
____________________
Parts or undercarriage work:
____________________
Attachments:
____________________
China inland transport:
____________________
Dismantling and loading:
____________________
Supplier-Confirmed Subtotal (A):
____________________
B. Estimated International Shipping Subtotal
Ocean freight:
____________________
Marine insurance:
____________________
Estimated Shipping Subtotal (B):
____________________
Estimated Port-Arrival Cost
Estimated Port-Arrival Cost = A + B
Estimated total:
____________________
C. Locally Confirmed Cost Subtotal
Destination port charges:
____________________
Import duty and tax:
____________________
Customs clearance:
____________________
Local transport:
____________________
Unloading:
____________________
Reassembly:
____________________
Other local costs:
____________________
Locally Confirmed Subtotal (C):
____________________
D. Arrival-Service Reserve
Initial inspection:
____________________
Oil and filters:
____________________
Spare or wear parts:
____________________
Maintenance reserve:
____________________
Arrival Reserve Subtotal (D):
____________________
Estimated Jobsite-Ready Budget
Estimated Jobsite-Ready Budget = A + B + C + D
Estimated total:
____________________
9. Frequently Asked Questions
Is the used excavator price the same as the total landed cost?
No.
The machine price is only one part of the total budget.
Preparation, attachments, China-side logistics, shipping and destination-side costs may also need to be calculated.
Why can two quotations for the same excavator be different?
The quotations may include different:
- Machine conditions
- Repainting work
- Parts replacement
- Attachments
- Dismantling
- Loading
- Shipping terms
Compare the included scope before comparing the final number.
Does FOB include ocean freight?
Normally, ocean freight is not included in an FOB quotation.
Buyers should still review the exact written scope and named port in the quotation or contract.
Does CIF include customs duty and delivery to my jobsite?
Not automatically.
A CIF quotation to a named destination port may still exclude destination port charges, customs clearance, import duty, local taxes, inland transport, unloading and reassembly.
Confirm these costs locally.
Can the supplier calculate my import duty?
The supplier may help explain the general cost structure, but current duty and tax should normally be confirmed with the buyer’s local customs broker or authority.
Should I prepare a maintenance budget after arrival?
Yes.
A reasonable arrival-service reserve may be useful.
The amount should depend on:
- Machine condition
- Service completed before shipment
- Local oil and filter prices
- Spare-parts availability
- Local maintenance costs
There is no single fixed percentage suitable for every used excavator.
What information is needed for a useful total cost estimate?
Provide:
- Country
- Destination port
- Machine model
- Quantity
- Required attachments
- Repainting requirement
- Undercarriage or parts requirements
- Preferred shipping term
The clearer the purchase scope, the more useful the estimate will be.
Ask for a Total Landed Cost Estimate
To prepare a more meaningful estimate, tell us:
- Your country
- Destination port
- Required excavator model
- Quantity
- Required attachments
- Whether repainting is needed
- Whether undercarriage or parts work is needed
- Preferred shipping term
We can help separate:
- Machine and preparation cost
- Attachment cost
- China-side transport and loading
- Estimated ocean freight and insurance
- Destination-side costs that require local confirmation
A reliable estimate does not hide uncertain costs inside one final number.
It shows buyers:
- What is included
- What is estimated
- What must be confirmed locally
- What should be reserved after arrival
